In fact, as the artificial beach, to protect beaches from wave attack, and management plans have been there. say, They will be New Year's Day, the investment funds to repair, to ensure that next summer, let visitors see a nice and beautiful beaches as in previous years.
Xinghai Bay Beach is an artificial beach, built in 1997, according to the current Minister of Xinghai Bay Beach Management Cao introduction, he Since the beach will be built just to work here, rare large waves, this summer, the weather is a big wave had not occurred. do not know why. white spray. waves washed into the sea. there have been such a big wave, as if something was churning the sea like, particularly strange. Big Wave occurred that night, and no staff these departments, so also expressed of several Gulf, there has been a rare big waves this. The average price of one cubic meter is 200 yuan. And this big wave, washing away about 10,000 cubic meters of sand, which also means that if you want to restore beach sand, at least need to invest 200 million yuan.
Read
Category: Default Category View comments
Last night, Xinghai Bay area hit by big waves, and yesterday morning, the front of the square from the sculptures to the Xinghai Bay beach area, still rough, past beautiful beaches, some 1500 meters long and 7 meters wide beach is washed into a large pit.
No comments:
Post a Comment